Monday, 12 July 2010

Sunday 11th July work party update

It was too hot to work but we forced ourselves ! Cut back a couple of overhanging branches from the fallen hawthorn by the dipping platform. Then cleared back overgrown nettles etc from footpath from damselfly pond to lower meadow area. One of our team volunteered to remove some more oak saplings from the meadow while the rest of us continued clearing paths around the ponds in the south of the park near Lower Bedfords Road. After lunch we 'attacked' the path from the other end by the 'cow pond' until the whole patch had been cleared. We did our usual litter pick at the same time and have to say that the litter situation wasn't as bad as it has been in the past. This is partly due to the efforts of volunteers/dog walkers who do litter picks during the week. The bins by the visitors' centre were overflowing however. This may have been due to wildlife getting into the bins and pulling rubbish out. It was noticed that there were LBH staff also litter picking.

No comments: